| 1821 |
Estimating the probability of unsatisfactory performance associated with the instability of mine developments |
Mining and Metallurgical Engineering Department |
2016 |
| 1822 |
Evaluation of Shear Strength of HSRC beams without web reinforcement |
Civil Engineering Department |
2016 |
| 1823 |
Evaluation of Shear Strength of HSRC beams without web reinforcement |
Civil Engineering Department |
2016 |
| 1824 |
Evaluation of the Effect of Rock Joints on the Stability of
Underground Tunnels |
Mining and Metallurgical Engineering Department |
2016 |
| 1825 |
Evaluation of the Effect of Rock Joints on the Stability of
Underground Tunnels |
Mining and Metallurgical Engineering Department |
2016 |
| 1826 |
Evaluation of the Effect of Rock Joints on the Stability of
Underground Tunnels |
Mining and Metallurgical Engineering Department |
2016 |
| 1827 |
Exact multi-length scale and mean invariant motif discovery
|
|
2016 |
| 1828 |
Exact multi-length scale and mean invariant motif discovery |
Electrical Engineering Department |
2016 |
| 1829 |
Experimental Application of H∞ Output-Feedback Controller on Two Links of SCARA Robot |
Mechatronics Engineering Department |
2016 |
| 1830 |
Experimental Investigation Of Layered Reinforced Concrete Beams |
Civil Engineering Department |
2016 |