| 861 |
Optimization of the Use of Sohag Governorate from the River Nile Water Quantity |
2010 |
| 862 |
Optimization of the Use of Sohag Governorate from the River Nile Water Quantity |
2010 |
| 863 |
Post-earthquake recoverability of existing RC bridge piers retrofitted with FRP composites |
2010 |
| 864 |
Post-yield stiffnesses and residual deformations of RC bridge columns reinforced with ordinary rebars and steel fiber composite bars. |
2010 |
| 865 |
Prediction of punching shear strength of two-way slabs strengthened externally with FRP sheets |
2010 |
| 866 |
Seismic Behavior of Rc – beam Column Joints |
2010 |
| 867 |
Seismic Design and Analysis of RC Beam- Column Joints of High
Rise Buildings |
2010 |
| 868 |
Seismic Desing and Analysis of RC Beam - Column Joints of High Rise Buildings |
2010 |
| 869 |
Seismic Pounding of Expasion Joints of Multi-Span Bridge Structure |
2010 |
| 870 |
Soil-pile interaction under lateral load |
2010 |