| 601 |
Effectiveness of waste stabilization ponds in removal of linear alkyl benzene salfonate (LAS) |
2013 |
| 602 |
Effectiveness of waste stabilization ponds in removal of linear alkyl benzene salfonate (LAS) |
2013 |
| 603 |
Effectiveness of waste stabilization ponds in removal of linear alkyl benzene salfonate (LAS) |
2013 |
| 604 |
Effects of soil-pile-structure interaction on the performance of pile group: centrifuge model tests |
2013 |
| 605 |
EQUIVALENT STRUT WIDTH FOR MODELING R.C. INFILLED FRAMES |
2013 |
| 606 |
EVALUATION OF CURRENT EGYPTIAN CODE ON SEISMIC BEHAVIOR OF MULTI-STOREY BUILDINGS
|
2013 |
| 607 |
Evaluation of Egyptian code provisions for seismic design of moment-resisting-frame multi-story buildings |
2013 |
| 608 |
Experimental investigation of concrete shear walls reinforced with glass fiber–reinforced bars under lateral cyclic loading
|
2013 |
| 609 |
Experimental investigation of concrete shear walls reinforced with glass fiber–reinforced bars under lateral cyclic loading
|
2013 |
| 610 |
Experimental Investigation of Concrete Shear Walls Reinforced with Glass Fiber–Reinforced Bars under Lateral Cyclic Loading |
2013 |