| 4161 |
Plastic cooling during injection molding ( BOOK ) |
|
2010 |
| 4162 |
Post-earthquake recoverability of existing RC bridge piers retrofitted with FRP composites |
قسم الهندسة المدنية |
2010 |
| 4163 |
Post-yield stiffnesses and residual deformations of RC bridge columns reinforced with ordinary rebars and steel fiber composite bars. |
قسم الهندسة المدنية |
2010 |
| 4164 |
Prediction of hydrogen sulphide corrosion in petroleum refinery complex pipelines |
قسم هندسة التعدين و الفلزات |
2010 |
| 4165 |
Prediction of punching shear strength of two-way slabs strengthened externally with FRP sheets |
قسم الهندسة المدنية |
2010 |
| 4166 |
Probability of drift failure due to nearby stope extraction |
قسم هندسة التعدين و الفلزات |
2010 |
| 4167 |
Project Management – A Proposition for Environmental Accountancy/Engineering Reporting, Conceptual Implementation Methodology , Egyptian Engineering Society |
|
2010 |
| 4168 |
Ramptime Current -Controlled APF for Harmonic
Mitigation, Power Factor Correction and Load Balancing |
الهندسة الكهربائية |
2010 |
| 4169 |
Ramptime Current -Controlled APF for Harmonic
Mitigation, Power Factor Correction and Load Balancing |
الهندسة الكهربائية |
2010 |
| 4170 |
Ramptime Current -Controlled APF for Harmonic
Mitigation, Power Factor Correction and Load Balancing |
الهندسة الكهربائية |
2010 |