| 5861 |
Interpretation of geophysical data for Abu Simble area, Western Desert, Egypt |
قسم هندسة التعدين و الفلزات |
2003 |
| 5862 |
Linear-Programming-Based Method for Optimum Schedule Reactive Power Sources in Integrated AC-DC Power Systems |
الهندسة الكهربائية |
2003 |
| 5863 |
Linear-Programming-Based Method for Optimum Schedule Reactive Power Sources in Integrated AC-DC Power Systems |
الهندسة الكهربائية |
2003 |
| 5864 |
Linear—Programming-BasedMethod for Optimum Schedule of Reactive Power Sources in Integrated AC-DC Power Systems |
الهندسة الكهربائية |
2003 |
| 5865 |
Lyapunov Based Fuzzy Control with Application to Robotic System |
|
2003 |
| 5866 |
Maintenance and Inspection of RC Structures using Non-Destructive and Destructive Tests |
قسم الهندسة المدنية |
2003 |
| 5867 |
Mathematical Modcling of the Circuit Breaker |
الهندسة الكهربائية |
2003 |
| 5868 |
Measurement of saturated liquid densities by a new apparatus with buoyancy’ |
|
2003 |
| 5869 |
Modeling of the onset of Gas Entrainment from a Stratified Two-Phase Region through Two Side Branches |
|
2003 |
| 5870 |
Modeling of the Onset of Gas Entrainment Through a Finite-Side Branch |
|
2003 |