تجاوز إلى المحتوى الرئيسي

Scheduling of automated guided vehicles and machines in flexible manufacturing systems: a simulation study

ملخص البحث
Flexible manufacturing systems (FMSs) have widely expanded in industry sectors all over the world. Scheduling is one of the problems that face the life cycle of FMSs. This paper introduces the simultaneous scheduling problem of automated guided vehicles (AGVs) and machines in FMSs. The study is based on discrete event simulation (DES) to solve that problem using benchmark data used by previous studies. The objective of this study is to determine the starting and completion times of each job to minimise the makespan. The results validate the robustness of the simulation model, especially for large-scale problems. Furthermore, they are compared against the other approaches and show consistency.
مؤلف البحث
Essam Kaoud
, Mahmoud Heshmat
, Mahmoud A. El-Sharief
and Mohamed G. El-Sebaie
مجلة البحث
International Journal of Industrial and Systems Engineering
مؤلف البحث
صفحات البحث
372-387
الناشر
Inderscience Publishers (IEL)
تصنيف البحث
1
عدد البحث
35-3
موقع البحث
https://www.inderscienceonline.com/doi/abs/10.1504/IJISE.2020.107775
سنة البحث
2020