| 5411 |
Optimization of blasthole burden, spacing, inclination, and delay time for the limestone quarries of Assiut Cement Company |
Mining and Metallurgical Engineering Department |
2005 |
| 5412 |
Optimization of the blast hole , burden , spacing , inclination , and delay time for the limestone quarries of Assiut Cement Company |
Mining and Metallurgical Engineering Department |
2005 |
| 5413 |
Optimum design of looped water distribution networks using a resilience index |
Civil Engineering Department |
2005 |
| 5414 |
Optimum design of looped water distribution networks using a resilience index |
Civil Engineering Department |
2005 |
| 5415 |
Optimum Duration of GPS Static Observations For Accurate Positioning |
Mining and Metallurgical Engineering Department |
2005 |
| 5416 |
Orthogonal Signal Decomposition with Applicathions in Wavelet Denoising In Proc. of the 22nd National Radio Science Conference (NRSC/URSI – The Academy of Scientific Research and Technology), The Arab Academy of Science, Tech. & Maritime Transport (C |
Electrical Engineering Department |
2005 |
| 5417 |
Orthogonal signal decomposition with applications in wavelet denoising |
Electrical Engineering Department |
2005 |
| 5418 |
Orthogonal signal decomposition with applications in wavelet denoising |
Electrical Engineering Department |
2005 |
| 5419 |
Orthogonal signal decomposition with applications in wavelet denoising |
Electrical Engineering Department |
2005 |
| 5420 |
Orthogonal signal decomposition with applications to wavelet de noising |
Electrical Engineering Department |
2005 |