| 1071 |
Optimal cross-layer resource allocation for critical MTC traffic in mixed LTE networks |
Electrical Engineering Department |
2019 |
| 1072 |
Optimal sizing of hybrid renewable energy system via artificial immune system under frequency stability constraints
|
Electrical Engineering Department |
2019 |
| 1073 |
Optimization for Design of Micro Energy Grids Using Multi-Objective PSO |
Electrical Engineering Department |
2019 |
| 1074 |
OPTIMIZATION OF THE ELECTROLESS NI-P COATING IN GLYCINE BATH BY TAGUCHI METHOD |
Mining and Metallurgical Engineering Department |
2019 |
| 1075 |
OPTIMIZATION OF THE ELECTROLESS NI-P COATING IN GLYCINE BATH BY TAGUCHI METHOD |
Mining and Metallurgical Engineering Department |
2019 |
| 1076 |
Optimization of the electroless Ni_P coating in glycine bath by Taguchi method |
Mining and Metallurgical Engineering Department |
2019 |
| 1077 |
Optimized energy management strategy for grid connected double storage (pumped storage-battery) system powered by renewable energy resources |
Electrical Engineering Department |
2019 |
| 1078 |
Optimized energy management strategy for grid connected double storage (pumped storage-battery) system powered by renewable energy resources |
Electrical Engineering Department |
2019 |
| 1079 |
Optimized energy management strategy for grid connected double storage (pumped storage-battery) system powered by renewable energy resources |
|
2019 |
| 1080 |
Parametric stability analysis of pillar performance at Nohyun limestone mine, South Korea—a case study |
Mining and Metallurgical Engineering Department |
2019 |